OPERATING INSTRUCTIONS
3991 1-25-06-4
OPERATING TECHNIQUES
ATTACHMENT TYPE BACKHOES
TRENCHING BETWEEN A BUILDING
AND AN OPEN EXCAVATION (CONTINUED)
Position the unit so the backhoe swing post is over the center line of the trench con-
nection. Dig with the backhoe at extreme swing positions, and in as close to the stabilizers
as possible. Pile the soil on the opposite side of the trenches.
Position the unit forward so the two trenches can be connected. Pile the spoil on the
opposite side of the trench.